Public institutions need to implement proper oversight measures for their procurement operations, while at the same time guarding against improper interference from oversight bodies in those procurement activities. Drawing from audit reports and public inquiry findings, this article summarizes the governing principles for striking the right balance between proper oversight and improper interference in public procurement.
Improper interference in public procurement has been well documented in multiple public audit reports. By way of recent example, in its November 2025 report entitled An Examination of Community Laboratory Services (Contract with DynaLIFE), the Auditor General of Alberta found that interference by the Minister of Health compromised the independence of the provincial health agency, Alberta Health Services, during the agency’s administration of a province-wide laboratory services RFP. (see Alberta Audit Finds Provincial Interference in Major RFP)
This finding of political interference in a major public sector spending decision was similar to the Ontario Auditor General’s December 2018 report entitled Metrolinx – GO Station Selection, where the provincial auditor found that the Ontario government and the City of Toronto interfered in the train station expansion plans of Metrolinx, an independent provincial agency. As the report detailed, after an extensive planning process, Metrolinx initially rejected new train stations at the proposed Kirby and Lawrence East locations because the cost of those stations significantly outweighed their advantages. However, the audit found that elected officials at the Ontario provincial government and the City of Toronto interfered with those initial recommendations, resulting in Metrolinx adding those two stations to its recommended expansion plans. (see Audit Finds Politicized Train Station Decisions)
Turning to the municipal front, in its August 2025 report entitled Investigation Report – Manitoba Municipalities and the Department of Municipal and Northern Relations, the Auditor General of Manitoba investigated a series of allegations regarding questionable practices in the Manitoba municipal sector and found “improper procurement, unauthorized expenditures, and governance failures” that raised red flags over a lack of provincial oversight of Manitoba municipalities. For example, the report found that the Head of Council for the Municipality of Ethelbert “improperly authorized procurements and generally operated unilaterally without involving council in the decisions.” In fact, the investigation found “a long history of questionable actions performed by the former Head of Council” that involved “circumventing the policies and procedures of the municipality and The Municipal Act.” (see Manitoba Municipal Audit Raises Oversight Issues)
Similarly, in its 2024 annual report, Ontario’s Auditor General found that the provincial government failed to follow its established procedures in a call for development (CFD) process for the redevelopment of Ontario Place. Citing many instances in which the process rules were not followed, the report concluded that the CFD decisions “were not fair, transparent or accountable to all participants.” For example, notwithstanding pre-established “no contact” protocols for the competition, the Auditor General found that some participants were “invited to meet with government officials and high-ranking political staff” during the open competition period. Further, the report found that minutes of meetings with participants were not kept during the process, which made it impossible for the auditor to determine whether all participants had equal access to information during the competition. The report also found that some proponents were short-listed even after ranking lower than other non-shortlisted proponents. The Auditor General recommended that future land development contract awards follow more clearly defined procurement procedures and best practices. (see Audit Finds Flawed Ontario Place Process)
These audits serve as a recent sample from a much deeper body of public audits that have raised concerns over improper senior-level interference in public sector contracting and spending decisions.
These oversight and interference issues have also been historically well-documented in a series of high-profile public inquiries that have established the importance of shielding public sector contract award decisions from inappropriate political interference. (see Depoliticizing the Procurement Process)
For example, a high-profile public inquiry involving the City of Toronto resulted in the 2003 Toronto Computer Leasing Inquiry/Toronto External Contracts Inquiry Report, known as the Bellamy Report. While that report concluded that elected officials on municipal councils can play a legitimate role in the procurement process by providing overall spending approvals and general oversight of the organization, it also found that it is in the self-interest of elected officials on municipal councils to avoid direct involvement in specific procurement processes. However, the Bellamy Report noted that this standard is not always observed in practice. Its analysis of the municipal level of government in Ontario revealed that elected officials often exercised an inordinate and inappropriate amount of direct influence over the public procurement process, particularly when local suppliers are involved in the bidding process.
The Bellamy Report attributed part of this interference to a lack of clear role definition. It also noted a lack of appreciation, on the part of some elected officials, of the control mechanisms that are in place, or should be in place, to ensure the proper administration of procurement processes. Rather than micro-managing specific projects and specific contract award decisions, the Bellamy Report concluded that municipal councils should establish proper accountability structures by establishing appropriate governing frameworks and support mechanisms for administrative staff.
To maintain the integrity of the bidding process, contract award decisions, like the decision on the selection of a proponent for the award of a contract, need to be based on the objective application of transparent evaluation criteria. The integrity of the process and quality of the outcome can become compromised when the decision-making becomes politicized, is open to the influence of lobbying activities, or is otherwise based on factors other than the application of predetermined transparent criteria.
However, these long-standing issues remain an ongoing concern in the municipal sector. In fact, a November 2020 judicial inquiry report in Ontario entitled Transparency and the Public Trust: Report of the Collingwood Judicial Inquiry found a series of questionable contract awards on major projects, as well as weak oversight and conflict management practices. Amongst other things, that report concluded that mayors do not have the power to make unilateral decisions on behalf of municipal council or to directly instruct municipal staff on behalf of municipal council. (see Ontario Inquiry Calls for Conflict Reforms)
These two examples are drawn from a deeper body of public inquiries within Canada and internationally that have raised similar concerns about improper political interference in government contracting decisions.
In conclusion, public audit and public inquiry reports serve as a valuable source for case studies that illustrate the inherent risk of political interference in the public procurement process. Public institutions should adopt policies and procedures that establish the necessary safeguards to protect against these inherent risks.
The themes in this article will be explored in greater detail in our new Fundamentals of Canadian Government Procurement certificate program that runs in April and returns in October. Please see our current training schedule for more details.