In its June 2025 determination in Buller Crichton Environmental Inc. v. Department of Public Works and Government Services, the Canadian International Trade Tribunal rejected a hidden criteria complaint after finding that the unstated evaluation criteria applied by the government could be reasonably implied by the specifications that were also included in the solicitation document. The dispute dealt with a request for standing offer (RFSO) for the provision of professional services for hazardous materials and indoor air quality assessments. A losing bidder sought a re-evaluation based on allegations that the evaluators applied hidden criteria when they scored its bid. The Tribunal rejected that challenge, finding that the evaluation criteria contained within the solicitation could be interpreted with the broader context of the contract specifications contained in other parts of that same solicitation.
The Tribunal found that the solicitation contained sufficient details regarding how the bids would be evaluated and that if the complainant had further questions regarding that scoring process, it should have sought a pre-bid clarification. More specifically, the Tribunal found that it was reasonable for evaluators to deduct points for missing “work steps” and “sampling strategy” under the prior work experience category even though those specific factors were not disclosed in the evaluation criteria since those additional factors aligned with the more general specifications for the required work set out in the RFSO.
As the Tribunal stated, the application of those additional factors “was logically consistent with and could reasonably be anticipated from the methodology set out in the RFSO” since the objective behind the criterion in question “was for bidders to demonstrate that they had the requisite past experience to deliver the services sought under the RFSO.” As the Tribunal further stated, “there is a direct link between the evaluation of the past experience of bidders in certain project areas and the anticipated service work under the standing offer, as noted in the RFSO’s statement of work” and there was therefore no reason to find that those challenged subfactors were undisclosed evaluation criteria.
While this bid protest was ultimately rejected, this case illustrates the importance of defining detailed scoring requirements rather than relying on specifications contained elsewhere in a solicitation document as the means of filling in the blanks in the stated evaluation criteria. In summary, drawing inferences from specifications to inform the interpretation of evaluation criteria is an inexact situation-specific process that can give rise to interpretive disputes and otherwise avoidable bid protests. Rather than relying on after-the-fact interpretive arguments, greater transparency in the original solicitation document can help avoid these types of downstream bid disputes.
The themes in this article will be explored in greater detail in the new RFx Drafting in the Canadian Public Sector certificate program that runs in May and repeats again in November. Please see our current training schedule for more details.