By Paul Emanuelli

Public institutions need to implement proper oversight measures for their procurement operations, while at the same time guarding against improper interference from oversight bodies in those procurement activities.

As this article discusses, the well-documented risks regarding political interference in the public tendering process (see Reports Address Political Interference Risks) have manifested themselves through multiple lawsuits against public institutions across Canada and internationally where evaluation and award decisions were tainted, or were alleged to have been tainted, by improper political interference.

By way of recent example, in its June 2025 decision in HP Consultants Inc. v. IIDI, the Supreme Court of Prince Edward Island dealt with the allegations of a losing bidder who claimed that the provincial cabinet improperly interfered with contract award decisions under the guise of providing “policy direction.” While the claim was ultimately dismissed, the case revealed a lack of clarity in the procurement oversight practices of the provincial cabinet and highlighted the need to maintain a clear distinction between the oversight role performed by an institution’s oversight body and interference by that body with the specific contracting decisions made by a public institution. (see PEI Court Rejects Hidden Criteria and Interference Claim)

Turning to the municipal sector, the November 2020 judicial inquiry report entitled Transparency and the Public Trust: Report of the Collingwood Judicial Inquiry by Ontario Associate Chief Justice Frank N. Marrocco concluded that municipal mayors do not have the power to make unilateral decisions on behalf of municipal council or to directly instruct municipal staff on behalf of municipal council. The Supreme Court of Canada came to the same conclusion in its November 2019 decision in Montréal (Ville) v. Octane Stratégie inc., where it ruled that the mayor of Montreal did not have the authority to unilaterally award a contract on behalf of the municipality. The Supreme Court ruled that the disputed contract awarded by the mayor and senior staff was void due the failure to obtain proper contract approvals in accordance with the municipality’s contract award procedures. (see Failure to Obtain Approvals Invalidates Contract)

In fact, it has been repeatedly noted by the courts that the integrity of high-profile projects can be compromised through lobbying and politicization, particularly where local contractors are competing against other bidders. (see Political Interference in the Bidding Process)

For example, in its September 1991 decision in Kencor Holdings Ltd. v. Saskatchewan, the Saskatchewan Court of Queen’s Bench held that the provincial Cabinet was not entitled to bypass the best bid in favour of a local bidder for a bridge construction project. The Court found that the Saskatchewan Cabinet could not use its privilege clause to bypass the low bidder based on an undisclosed local preference. The Court found Saskatchewan in breach of its fair bidding obligations and awarded the plaintiff bidder damages for its lost profits.

In its September 1993 decision in Zutphen Brothers Construction Ltd. v. Nova Scotia (Attorney General), the Nova Scotia Supreme Court found that the government unfairly awarded a major contract to a local contractor. The Court noted that “the steel industry lobbied the Department to permit them to bid on the final phase of the construction and eventually it was agreed that parties be permitted to tender on a steel alternative.” This lobbying resulted in a last-minute amendment to the specifications to allow for bids based on steel even though the specifications were designed for a concrete bridge. The Court found that the government ignored internal engineering advice and awarded the contract to the local steel bidder even though the original concrete design was more cost-effective. The Court concluded that the contract was improperly awarded and that the integrity of the bidding process had been violated by interference in that process. The government was found liable to the plaintiff bidder for lost profit damages.

These cases are not limited to Canadian government procurement. For example, in its June 1997 decision in Hughes Aircraft Systems International v. Airservices Australia, the Federal Court of Australia, General Division, found Airservices Australia liable for conducting an unfair evaluation process based on an undisclosed local preference. The Court determined that the aviation authority breached the rules when its board unfairly strayed from the predetermined evaluation rules and bypassed the best bid in favour of a local bidder for “geo-political” reasons. (see Australian Authority Liable for Local Preference)

Further, in its October 1999 judgment in Harmon CFEM Facades (UK) Ltd. v. The Corporate Office of the House of Commons, the England and Wales High Court (Technology and Construction Court) found that the Corporate Office of the House of Commons breached the tendering rules by applying an undisclosed “Buy British” policy to the evaluation of competing bids. The Court found that the evaluation process was “a charade” that was compromised by, among other things, political interference aimed at promoting a predetermined hidden preference for a local bidder over a foreign bidder. (see House of Commons Liable for “Buy British” Policy)

As these cases illustrate, lobbying and political interference can undermine the integrity of a public procurement process. To protect against these risks, it is essential to sequester the government evaluation process from actual or apparent political interference and lobbying. These measures should include clear protocols to guard against conflict of interest (see Conflict of Interest in Canadian Procurement). Failing to do so can expose a public institution to significant legal, reputational, and operational risks.

More generally, the direct involvement of elected officials can also compromise the contracting process and result in legal liability to a public institution. For example, in its December 2000 decision in Greenslade’s Construction Co. v. Conception Bay the Newfoundland Supreme Court found a municipality liable due to a poorly managed construction project where the mayor improperly intervened in the preparation of flawed project specifications and in subsequent contract administration decisions. (see Mayor’s Interference Leads to Contract Dispute) Similarly, in 2001 in its decision in Founders Square Ltd. v. Nova Scotia (Attorney General), the Nova Scotia Court of Appeal found the provincial government liable for exercising its lease termination rights under a contract since the Premier had made prior verbal commitments to the contractor promising a longer-term funding arrangement. (see Weak Approval Protocols Cause Liability)

In summary, in the public sector tendering process, the evaluation of bids is typically delegated to an internal team who scores competing offers against pre-established criteria and makes a contract award recommendation to a higher-level oversight body for a formal award. Since these procedures are subject to strict due process standards, public institutions should establish award protocols that protect against improper interference, guard against conflict of interest, and properly balance the competing duties of transparency, confidentiality and neutrality in bidding procedures. (see Establishing Proper Approval Protocols)

The themes in this article will be explored in greater detail in our new Fundamentals of Canadian Government Procurement certificate program that runs in April and returns in October. Please see our current training schedule for more details.