In its November 2025 decision in Bot Construction et al. v. Minister of Transportation, the Ontario Superior Court of Justice upheld an arbitration decision that awarded Bot Construction $14 million in extra contract costs. The dispute dealt with a $55 million contract for the expansion of Highway 69 near Sudbury Ontario from two lanes to four lanes.
The tendered contract required the contractor to blast approximately 1 million cubic metres of Canadian Shield rock, which would then be used as part of the construction project so that the amount blasted would balance out against the amount used for the project for highway work including the construction of embankments. However, the actual amount of blasted rock created while expanding the highway greatly exceeded the amount required for the project work. In a resulting arbitration, the contractor was awarded the additional amount for costs incurred while dealing with the unexpected quantity of excess rock. While the government appealed the arbitration ruling, arguing that the contractor should have taken these risks into account when it prepared its bid price, the court dismissed the appeal after finding no errors in the arbitration ruling.
This decision, which offers a useful case study illustrating why purchasing institutions should adopt formal document drafting and material disclosure protocols to deal with project-related extra cost risks, will be featured in the Meeting Material Disclosure Duties module of our RFx Drafting in the Canadian Public Sector certificate program that runs in May and returns in November. Please see our current training schedule for more details.