In its 2025 report entitled Maintenance of Public Housing Units, the Auditor General of New Brunswick found that New Brunswick Housing, the province’s public housing agency, was not meeting its post-vacancy readiness targets for accommodating new tenants. The report attributed the problem to major maintenance delays caused by weak inspections, contract management issues, and the failure to develop a province-wide maintenance budget based on actual needs.
While the housing agency’s policy requires that all vacant units be made available as soon as possible and no later than 30 days after being vacated, the report found that it took an average of 140 days to fill vacant units, with only four percent of those units meeting the 30-day performance target. As the report concluded, “New Brunswick Housing Corporation does not have adequate systems and practices in place to ensure properties are well-maintained, safe and habitable for tenants on a timely basis.”
Further, while the agency’s operations manual calls for annual unit inspections and the development of a regular maintenance schedule, the report found that New Brunswick Housing does not monitor the completion of its inspection. In fact, the report found that only 15 percent of units audited during the audit period met the annual inspection requirements.
Turning to the time it took to complete repairs once deficiencies were identified, the report found that 71 percent of urgent repairs were not completed within 24-hour target time and 36 percent of general repairs did not achieve their target completion times. With respect to categories of repairs, the audit found that 39 percent of plumbing issues, 35 percent of electrical issues, 57 percent of mold issues, and 28 percent of fire safety and elevator issues were not resolved within the targeted timeframes.
The report also found a lack of proper oversight for a centrally administered safety inspections contract, with “no monitoring system to determine that the annual requirement had been met for all buildings and units” and no standard inspection form to ensure consistency in inspection across the province.
The report also concluded that the annual maintenance budget was not based on actual maintenance needs but was based on prior annual budgets. The Auditor General recommended that the agency adopt an annual needs-based approach to establishing its maintenance budget.
This report, which illustrates the importance of establishing a formal protocol for the development of annual budgets that enable proper planning and timely procurements, will be featured in the Leveraging Portfolio Management and Centralized Spending module of our new Fundamentals of Canadian Government Procurement certificate program that runs in April and returns in October. Please see our current training schedule for more details.